2008-59s - To adopt an updated stormwater management and site development manual as required by the state issued Phase 1 MS4 General Permit and as directed by the federal Clean Water Act (CWA) and the state Water Pollution Control Act (WPCA).
- Exhibit A
- Exhibit B
- Exhibit C (complete stormwater manual)
---Volume 1 - Minimal Technical Requirements and Site Planning
---Volume 2 - Construction Stormwater Pollution Prevention
---Volume 3 - Hydrologic Analysis and Flow Control BMPs
---Volume 4 - Source Control
---Volume 5 - Runoff Treatment BMPs
---Volume 6 - Low-Impact Development
---Volume 7 - Design details
Approved: Sept. 23, 2008
Effective: March 1, 2009
CONTACT: Jeff Cox, Council Legal Analyst, (253) 798-7579, jcox@co.pierce.wa.us