Word on the Street: Improvements to Canyon Road East (from 224th Street East to 200th Street East)

What's Happening
We're improving 1.70 miles of Canyon Road East from 224th Street East to 200th Street East (CRP 5123). Improvements, designed to increase transportation connectivity, include:

  • Extending Canyon Road East to connect between 224th Street East and 200th Street East.
  • Providing an interim three lanes of the future five lane roadway.
  • Constructing sidewalks and paved shoulders for pedestrians and bicyclists.
  • Providing signals at 224th Street East and 208th Street East.
  • Realigning the intersection of Canyon Road East & 200th Street East to the north.


CRP 5123 Roadway Sections

(click to enlarge)

Note: The ''Future'' roadway section is not currently funded and the time for implementation is yet to be determined.


March 2008

  • Engineering: We are in the Preliminary Engineering Phase of the project. Roadway alignments are being finalized. Work will begin soon on designing the storm water conveyance systems, retaining walls and signal systems.
  • Land: The goal is to build all interim improvements within the existing right-of-way.
  • Survey: Indentification of existing right of way limits and topography is complete.
  • Geotechnical: Geotechnical investigations will be preformed to help determine the project retaining walls & stormwater facilities designs.
  • Environmental: We are investigating potential wetland mitigation sites.


  • January 2008 to June 2008: Complete Preliminary Engineering design plans, initiate environmental documentation.
  • September 2007 to September 2009: Research, analyze, and acquire wetland mitigation site.
  • July 2008 to December 2009: Complete Construction plans, specitications, and estimates.
  • 2010 to 2012: Construction


Vicinity Map Small

Photo Small


How does the money get spent?

  • Engineering: $2,012,800
  • Right-of-Way acquisition: $3,000,900
  • Construction: $9,405,700

Where does the money come from?

  • County Road Fund / REET: $14,419,400


Gregory M. Hess, P.E.

Gregory M. Hess, P.E.
Engineering Resources Supervisor

More Details
Find more details such as revenues, cash flow, and fact sheets.

Contact - Engineering Resources Supervisor:
Email: Gregory M. Hess, P.E. (gregory.hess@co.pierce.wa.us) for more information.
Phone: (253) 798-2283

Pierce County Public Works and Utilities
4301 South Pine Street, Suite 446
Tacoma, WA 98409-7207

CRP 5123 | March 2008


Pierce County Ferry
Schedule, fares, and more.

Track our Progress
View our budget performance charts.

PC Responds
Stop illegal dumping.

Request Road Maintenance
(253) 798-6000

Report Downed Signs
(253) 531-6990

Privacy Policy | Text Only Version | Webmaster

Copyright © 1996-2008 Pierce County Washington. All rights reserved.
             
Last Modified
Sep 17 2008 10:31AM