pierce county logo Pierce County mount rainier left mount rainier mount rainier left
Public Works and Utilities
horizontal page banner

Public Works & Utilities >> County Road Projects >> Wollochet Drive NW (40th Street NW to East Bay Dr NW)


Word on the Street: Improvements to Wollochet Drive NW (from 40th Street NW to East Bay Drive NW)

What's Happening
We're improving approximately 1 mile of Wollochet Drive NW (CRP 5696). Improvements, designed to relieve traffic congestion, include:

  • Expanding the roadway to 3 lanes between 40th Street NW and Artondale Drive NW.
  • Expanding the roadway to 4 lanes between Artondale Drive NW and East Bay Dr NW.
  • Adding turn lanes at intersections.
  • Adding concrete curbs, gutter and sidewalks.
  • Adding street lighting.
  • Adding an enclosed storm drain system as well as stormwater treatment.
  • Improving the existing traffic signals at 40th Street NW, Artondale Drive NW and East Bay Drive NW.

Design work on this project is being coordinated with the Wollochet Drive NW Project from East Bay Drive NW to Fillmore Drive NW (CRP 5542).


ROADWAY IMAGE


April 2008

  • Engineering: Roadway alignment designs have been completed. Designs are being completed for the traffic signal systems, the enclosed storm drain system and for retaining walls.
  • Land: Right-of-way plans have been completed. Right-of-way appraisals will soon be completed for the needed property and easements.


  • March 2006 to October 2009: Roadway Design.
  • November 2007 to October 2009: Aquire right-of-way.
  • May 2005 to October 2009: Finalize permits, environmental documents, plans and estimates.
  • 2010-2011: Construction


Vicinity Map Small

Photo of Existing Wollochet Drive NW


How does the money get spent?

  • Engineering: $1.22 million
  • Right-of-Way Acquisition: $2.14 million
  • Construction: $9.60 million

Where does the money come from?

  • 2nd Real Estate Excise Tax: $3.88 million
  • Traffic Impact Fee: $3.26 million
  • Unfunded Revenue: $5.82 million


greg hess

Gregory M. Hess, P.E.
Engineering Resources Supervisor

More Details
Find more details such as revenues, cash flow and fact sheets.

Contact - Engineering Resources Supervisor
Email: Gregory M. Hess, P.E. (gregory.hess@co.pierce.wa.us) for more information.
Phone: (253) 798-2283

Pierce County Public Works and Utilities
4301 South Pine Street, Suite 446
Tacoma, WA 98409-7207

CRP 5696 | April 2008


Pierce County Ferry
Schedule, fares, and more.

Track our Progress
View our budget performance charts.

PC Responds
Stop illegal dumping.

Request Road Maintenance
(253) 798-6000

Report Downed Signs
(253) 531-6990

Privacy Policy | Text Only Version | Webmaster

Copyright © 1996-2008 Pierce County Washington. All rights reserved.
             
Last Modified
Sep 17 2008 10:45AM