We've completed concept-level engineering work for future improvements to Garfield Street South between Park Avenue South and SR-7 (Pacific Avenue South). The conceptual engineering built upon the common theme and vision developed in the community-based 'Garfield Streetscape Improvement Plan'. We also developed conceptual plans and a cost estimate for the future improvements, which may include the following:

  • Installing curb bulbs.
  • Adding mid-block pedestrian crossings.
  • Parallel parking on both sides of the street.
  • Improving street lighting.
  • Adding street furnishings, such as benches and trash receptacles.
  • Adding street trees and plantings.
  • Undergrounding overhead utilities, if feasible.
  • Modifications to the signal systems at Park Ave. S. and C St. S.

The project will now move into the funding application phase. This phase will seek out funding sources needed before beginning the additional engineering, right-of-way aquisition and construction.


ALT TEXT


December 2008

  • Land: Preliminary right-of-way impacts have been assessed.
  • Engineering: The 'Garfield Streetscape Improvement Plan' has been reviewed and the initial design work, such as pavement rehabilitation options and sidewalk features have been evaluated. Concept-level engineering is complete and ready for use in future grant funding opportunities.
  • Traffic: Street lighting, mid block pedestrian crossing locations and traffic signal modifications have been reviewed.


VICINITY MAP

(click to enlarge)

Job site photo

(click to enlarge)


  • November 2008: Completed concept engineering and cost estimate.
  • 2009: Grant funding opportunities will be sought to enable additional engineering, right-of -way acquisition, and construction to occur.


supervisor photo

Patrick Baughman,P.E.
Engineering Resources Supervisor

More Details
Additional information on this project can be found in the project newsletters and fact sheets.You must have Adobe Acrobat Reader.

Contact - Engineering Resources Supervisor
Email: Patrick Baughman, P.E. (patrick.baughman@co.pierce.wa.us) for more information.
Phone: (253) 798-3157

Pierce County Public Works and Utilities
4301 South Pine Street, Suite 446
Tacoma, WA 98409-7207

CRP 5730 | December 2008


Pierce County Ferry
Schedule, fares, and more.

Track our Progress
View our budget performance charts.

PC Responds
Stop illegal dumping.

Request Road Maintenance
(253) 798-6000

Report Downed Signs
(253) 531-6990

Privacy Policy | Text Only Version | Webmaster

Copyright © 1996-2008 Pierce County Washington. All rights reserved.
             
Last Modified
Nov 18 2008 8:05AM