pierce county logo Pierce County mount rainier left mount rainier mount rainier left
Public Works and Utilities
horizontal page banner

Public Works & Utilities >> Surface Water Management >> Capital Improvement Program >> Lower Puyallup River Levee Investigation


Lower Puyallup

Click on Picture to Enlarge

Pierce County is conducting the Lower Puyallup River Flood Protection Investigation study to address significant flood and floodplain mapping related issues affecting communities along the Lower Puyallup River.

The Phase 1 study is a first step in the process of finding ways to reduce the size of the recently FEMA mapped floodplain for the Lower Puyallup River. This study evaluated flood related conditions along the river as they are today and as they will be in 50-years if no new flood protection project is undertaken.

The study includes analysis for hydrology/hydraulics, integrity of the existing levee structure, sediment deposition and economic impacts from expected flooding.

The County has committed to looking at improving the flood control system in this area to reduce the impacts of flooding on our community. The information contained in the Phase 1 study is required for evaluating any improvements to the flood control system. The Phase 1 study was performed to US Army Corps of Engineers standards to allow for Federal assistance with this large project.

Adobe Reader
For ease of download and viewing, documents on this webpage are available as Adobe Acrobat PDF files.


Lower Puyallup Rover

Chapter 1: Introduction (543kb)

Chapter 2: Hydrology (309kb)

Chapter 3: Preliminary Geotechnical Evaluation of Levees (188kb)

Chapter 4: Sediment Transport and Deposition (150kb)
Chapter 6: Economic Analysis (939kb)
References (140kb)

Appendices

  • Appendix A - Environmental Setting 32,940kb)

  • Appendix B - River Cross Sections (2,311kb)

  • Appendix C - Cross Section and Sampling Locations (7,963kb)

  • Appendix D - Sediment Sampling Laboratory Results (131kb)

  • Appendix E - Commencement Bay Transects (1,142kb)

  • Appendix F - HES-RAS Model Cross-Section Information (16kb)

  • Appendix G - Economic Analysis Risk Inputs and Summary Results (573kb)


For questions or comments regarding the Investigation, please call or email:

Randy Brake
Surface Water Management Engineer
253-798-4651


Pierce County Ferry
Schedule, fares, and more.

PC Responds
Stop illegal dumping.

Request Road Maintenance
(253) 798-6000

Report Downed Signs
(253) 531-6990

Locations & Directions
Public Works & Utilities building locations and directions


Privacy Policy | Text Only Version | Webmaster

Copyright © 1996-2010 Pierce County Washington. All rights reserved.
             
Last Modified
Jul 15 2010 9:13AM