pierce county logo Pierce County mount rainier left mount rainier mount rainier left
Public Works and Utilities
horizontal page banner

Adobe Reader
For ease of download and viewing, documents on this webpage are available as Adobe Acrobat PDF files.


County is revising its Stormwater Management and Site Development Manual (SWM) to be equivalent to the Washington State Department of Ecology's current (2005) Stormwater Manual. The equivalency is a requirement in the County's NPDES Phase-I permit (National Pollution Discharge Elimination System, NPDES, is part of the Federal Clean Water Act). The Ecology Manual will be the framework for the new County SWM Manual which is divided into five volumes. County staff will initially meet to blend the two manuals together and create a preliminary draft. An external (to County government) stakeholders group will then review and comment on the preliminary draft. The Surface Water Advisor Board (SWAB) will be briefed at each step and consulted for major policy decisions that arise from the process. A completed draft of the SWM Manual will them be presented to the Pierce County Council for adoption and to the State Department of Ecology for a determination on its equivalence.

A Determination of Non-Significance (DNS) was issued on 8/11/08. All comments received by the County-PALS are posted below, along with the County's response.

SWM Comments and Responses (pdf)

SEPA Notice and Contact Information (pdf)

Environmental Checklist (pdf)



Cover

Pierce County Council adopted the SWM Manual and proposed changes to Title 11 and 17A, on September 24, 2008, with one amendment to modify the Table of Contents in Volume III.

EFFECTIVE DATE FOR THE NEW MANUAL IS MARCH 1, 2009.

Pierce County Council website


SWM Volume I - Minimum Technical Requirements and Site Planning (pdf)
SWM Volume II - Construction Stormwater Pollution Prevention (pdf)
SWM Volume III - Hydrologic Analysis and Flow Control BMPs (pdf)
SWM Volume IV - Source Control (pdf)
SWM Volume V - Runoff Treatment BMPs (pdf)
SWM Volume VI - Low Impact Development (pdf)

Section A - Quantity Design Standards

Section B - Quality Design Standards

Section C - Erosion and Sediment Control Plan Details

Section D - Soil Evaluation Report Forms

Section E - Standard Stormwater Notes

Section F - Stormwater Facility Informational Sign Specifications

Section G - Engineer's Inspection Report Form

Section H - Facility Summary Form

Section I - Covenants, Right of Entry, Bond and Assignment Forms

Section J - FEMA Elevation Certificate

Section K - Change Order Review Form


Staff Report to the Pierce County Council

Including proposed ordinance and manual changes

Ordinance 2008-59s (pdf)

Attachment A Title 11.05 Amendments (pdf)

Attachment B Title 17A Amendments (pdf)

SWM Manual Staff Report (pdf) - see attached file

Attachment C SWM Manual Cover Page (pdf) - manual sections listed below



Ecology Manual
Current SWM Manual Work Plan
Member List


The Stakeholder Group Meetings have concluded for this process and we would like to thank all the participants for their extended community service in reviewing the drafts over the last three years. A listing of the issues that rose during the meetings and the resolution, usually by full consensus of the group and county, can be viewed below.

Listing of Issues

Planning Commission Meeting:

June 18, 2008 at 7pm - Agenda

June 24, 2008 at 8:30am - Agenda



Pierce County Ferry
Schedule, fares, and more.

Track our Progress
View our budget performance charts.

PC Responds
Stop illegal dumping.

Request Road Maintenance
(253) 798-6000

Report Downed Signs
(253) 531-6990
Privacy Policy | Text Only Version | Webmaster

Copyright © 1996-2008 Pierce County Washington. All rights reserved.
             
Last Modified
Sep 24 2008 4:14PM