Collections Manhole Rehabilitation

IMG_0781-web

About the Project


This is a preservation project to rehabilitate 18 existing sewer manholes located throughout the county’s sanitary service area. 

The contractor is responsible for temporarily bypassing wastewater flows and providing traffic control to access the manholes. All work will be done from inside the manholes. Construction digging is not anticipated.

Work is expected to take place between 7:30 a.m. and 6:00 p.m. on weekdays on most manholes through the completion of the project. Several manholes in high traffic areas or in cities (122nd Avenue E., 112th Street E., 47th Street W., Canyon Road E., Ross Road, and Market Court W.) will have preservation work performed at night or during reduced daytime hours to limit impacts to motorists and to comply with city permit requirements). Residents may be asked to reduce their wastewater discharge while construction is taking place.

The work is not expected to cause traffic delays, however motorists, bicyclists, and pedestrians should exercise caution in areas where crews are operating.

Work at each manhole may include: 
  • Cleaning and removal of damaged material from manholes
  • Work to prevent groundwater infiltration
  • Manhole wall, shelf and channel rehabilitation

Project Locations:

Pierce County 
Manhole #
Manhole Location   Anticipated
Construction Dates
10325 13205 112th Ave E Puyallup, WA June 24 - 25
11592 11800 130th St E. South Hill, WA June 26 - 28
11727 5521 184th St E. Puyallup, WA July 1 - 3
11017 17304 Gem Heights Dr E. Puyallup, WA July 8 - 9
12672 18310 113th Ave E. Puyallup, WA July 15 -16
11332 11700 170th St E. South Hill, WA July 17 - 18
13064 14207 Meridian South Hill, WA July 19 - 22
12494 980 Ross Rd  Dupont July 23 - 24
11110 6919 47th St W University Place Aug 19
15479 3555 Market Ct W. University Place Aug 20 
11686 20100 14th Ave E. Spanaway Aug 5 - 6 
10850 16800 122nd Ave E. South Hill Aug 7 - 8 
09393 1335 192nd ST. E. Spanaway, WA Aug 9 - 13 
13566 9202 198th St Ct E. Graham, WA Aug 24
10982 5800 112th St E. Puyallup Sept 9 - 14
10981 5700 112th ST. E. Puyallup, WA Sept 9 - 14
11853 16207 Canyon RD. E. Puyallup, WA Sept 16 - 21
12549 11620 Canyon RD. E. Puyallup, WA Sept 16 - 21

Project Funding


Total Project Cost:

Approximately $317,000

Project Funding Sources:
Pierce County Public Works Sewer Construction Fund

Construction Contractor:

Realm, Inc.

Project Timeline



Begin Construction:

June 24, 2019

Anticipated Completion Date:

September 14, 2019
Contact Us
Send a message arrow
Design Engineering 
& Construction Manager

Steve Chanfrau
Email Steve Chanfrau
Ph: (253) 798-4129
Construction Engineering Supervisor
Jeff Roscoe, P.E.
Email Jeff Roscoe
Ph: (253) 798-2119