Point Fosdick Dr NW - Stone Dr NW to Gig Harbor City Limits (CRP 5880)

What’s Happening
Engineering: We are beginning the design engineering for the project. Currently we are gathering information about the existing site conditions and initiating contact with utility companies.


Land: All improvements are expected to fit within the existing right-of-way.


Surveying: County surveyors will be in the area gathering field data of the project area.

Image of the project vicinity map.
Image of the project.

About the Project
Planned improvements to Point Fosdick Drive Northwest from Stone Drive Northwest to the Gig Harbor City Limits (CRP 5880) are intended to preserve the existing roadway and restore a smooth surface. The improvements would include the following:


  • Fracturing the existing Portland cement concrete pavement through a process called crack and seat to provide a firm and stable base for the new asphalt surfacing.
  • Install guardrail at several locations.
Project Timeline

April 2020 to Early 2022Field data collection, design engineering, development of construction plans, specification and estimate. 


Summer 2022: Begin construction.

Contact Us

Patrick Baughman, P.E., PMP

Design Supervisor

Phone: (253) 798-3157

Address:

2702 S 42nd Street, Suite 109

Tacoma, WA 98409