2021 Road Safety - Guardrails (CRP 5918)

What’s Happening
Engineering: Pierce County is in the final design stage.


Land: All improvements are expected to fit within the existing right-of-way.


Environmental: Necessary environmental permits will be obtained as needed.

About the Project
Planned improvements for the 2021 Road Safety - Guardrails (CRP 5918) project involves installing guardrail at various locations throughout the County. The locations include:


Image of the project vicinity map. Opens in new windowGroup 1: Crescent Valley Drive Northwest
(MP 11.00 to MP 11.03)
Install guardrail on the right side of the roadway.
Image of the project vicinity map. Opens in new windowGroup 2: Rhodes Lake Road East
(MP 4.67 to MP 4.90)
Install guardrail on the left side of the roadway.
Image of the project vicinity map. Opens in new windowGroup 3: 214th Avenue East
(MP 3.25 to MP 3.33)
Replace the existing guardrail reflectors only.
Image of the project vicinity map. Opens in new windowGroup 4: Alder Cutoff Road East
(MP 5.12 to 5.20; MP 5.12 to 5.38)
Install guardrail on both sides of the roadway.
Image of the project vicinity map. Opens in new windowGroup 5: Alder Cutoff Road East
(MP 4.15 to 4.18)
Install guardrail on the left side of the roadway.
Image of the project vicinity map. Opens in new windowGroup 6 & 7: Alder Cutoff Road East
(MP 3.19 to 3.29; MP 3.34 to MP 3.49)
Install guardrail on the right side of the roadway.
Image of the project vicinity map. Opens in new windowGroup 8: Alder Cutoff Road East
(MP 1.25 to MP 1.34)
Install guardrail on both sides of the roadway.
Image of the project vicinity map. Opens in new windowGroup 9: Alder Cutoff Road East
(MP 0.56 to MP 0.63)
Install guardrail on the right side of the roadway.
Image of the project vicinity map. Opens in new windowGroup 10: Alder Cutoff Road East
(MP 0.17 to MP 0.30)
Install guardrail on the right side of the roadway.
Project Timeline

Spring 2020Begin preliminary engineering, development of construction plans, specifications, and estimates.


Summer 2021: Begin construction.